swift-solo
[Top] [All Lists]

Re: Tiller Layup & Centerboard and Rudder layup

To: "Greg Ryan" <gregoryrryan@xxxxxxxxxxx>,"Rob DesMarais, D.C." <drrld@xxxxxxxxxxx>,<swiftsolo@xxxxxxxxxxxx>
Subject: Re: Tiller Layup & Centerboard and Rudder layup
From: "Mark White" <Mark@xxxxxxxxxxxxxxxxxxxxxx>
Date: Wed, 21 Dec 2005 17:06:48 -0700
References: <000401c60667$985763e0$0201a8c0@OFFICE> <BAY102-DAV177B70CF04B152D434A2F0CA310@phx.gbl>
Greg and/or Bram,

I have 5 page instruction sheet.  There is no reference to the placement of the 
short pieces that I can find.

Roll 1 hybrid is cut 16" short.  
Rolls 2 and 3 hybrid are cut 1" short.
  
Roll 4 carbon is cut 10" short.  
Rolls 5 and 6 carbon are cut 1" short.  

I can guess that the rolls that are cut 1" short are held 1/2" from each end.  

What do you do with the ones that are 16" and 10" short?  Start them 1/2" from 
the tops?

Do I also cut down respective pieces for the rudder?  If so how short?

Mark


----- Original Message ----- 
  From: Greg Ryan 
  To: Rob DesMarais, D.C. ; swiftsolo@xxxxxxxxxxxx 
  Sent: Wednesday, December 21, 2005 2:12 PM
  Subject: Re: Tiller Layup & Centerboard and Rudder layup


  Tiller Layup, 
  In contact with the foam, one layer of hybrid braided tube or hybrid tape 
(the bi-directional type). Two pieces of unidirectional 3 inch wide carbon tape 
placed longitudinally, make the overlap on the top and bottom surfaces, then a 
layer of carbon braided tube that extends 24 inches from the fat end towards 
the thin end, and finally a layer of braided carbon tube on the outside. 
Lightly sand smooth and cover the outside with 207special hardener / epoxy.  
You can remove the foam internally with acetone if need be especially at the 
forward and back ends.  Fill the ends with epoxy 410/graphite to 1) strengthen 
the joint to the cassette, 2) provide a small exit hole on the top front 
surface for shock cord exit for the extension keeper system.  Drill and ream a 
hole in the underside of the tiller about 8-12 inches back from the front. You 
can pass 2 pieces of shock cord through the tiller from the bottom hole and out 
through the hole in the front of the tiller, connect to the extensions. Tension 
the shock cord and tie a knot in the bottom just outside the hole. 
  Greg

  PS Mark you received a 5 page illustrated handout on making CB and rudders 
with your cores.





  ----- Original Message ----- 
    From: Rob DesMarais, D.C. 
    To: swiftsolo@xxxxxxxxxxxx 
    Sent: Wednesday, December 21, 2005 2:48 PM
    Subject: Tiller Layup


    How many layers of carbon would you use or what is the recommend layup?





                 Rob




<Prev in Thread] Current Thread [Next in Thread>

This is the Swift Solo mailing list archive. Visit here to see instructions on how to subscribe and unsubscribe from the list, and to browse the mailing list archives.